Adjust Flats Wizard Start Time Based on Previous Results

Would it be logical in the flats calibration wizard to assume the time for binning at say 3x3 will be <= to the time the next lowest binning level if one exists ? e.g. if Ha 1x1 is 6.43s there the starting point for Ha 2x2 would be 6.43?

It is completely logical, but we have never done it because running the flats wizard is not a common activity. Will accept as unplanned for now.